Ohio County Court Calendars Explained
The Ohio County court calendar belongs to Ohio Circuit Court, the county's only current court of record. Its identifier is 58C01. No separate Ohio County daily-calendar web endpoint appeared in the official source set. That does not mean the court lacks an internal calendar. A public reader should start with the case summary in Indiana MyCase, then confirm a live setting with the court or clerk.
MyCase can show a hearing within the Chronological Case Summary, called the CCS. The display is not the official record and may contain delays or omissions. The newest case notice, order, and court calendar control.
Ohio Circuit Court handles criminal, civil, family, juvenile, probate, small-claims, traffic, ordinance, and protection-order causes. They share one identifier but not one schedule. A CM case may show an initial hearing or plea. A CT case may show a motion or trial. An SC case follows a small-claims track. Read the event label before deciding what the Ohio County court date means.
Ohio County Daily Docket Rule
Indiana Administrative Rule 9 requires trial courts to make daily calendars available electronically or in another format. Public fields include case number, caption, date, time, and location when disclosure is allowed. Ohio County's pages do not link a stand-alone feed, so the clerk's phone and counter remain key channels.
The Indiana implementation schedule documents the statewide technology context.

The schedule helps explain why case tools are statewide while the local clerk keeps the official Ohio County record.
A sound date check uses three steps. Read the newest public CCS event. Compare it with any later order, notice, continuance, reassignment, plea, or judgment. Then call the clerk when the event is near, restricted, or unclear. Record when the online calendar was checked because an Ohio County setting can change afterward.
A case notice is more useful than a general schedule because it identifies one case and event. If two sources conflict, ask the court or counsel which notice controls.
Finding Your Ohio County Court Date
Use more than one channel when an appearance is near. Check MyCase, call the clerk, ask at the clerk's counter, review any public daily calendar or courthouse posting, and compare the result with the notice from counsel. A current court order controls.
- Open MyCase and search the exact case number, narrowed to Ohio Circuit Court.
- Read the newest CCS entry and any public linked order.
- Check for a later continuance, reassignment, plea, judgment, or new setting.
- Call the Ohio County Clerk or ask at Room 207, 413 Main Street, Rising Sun, when timing is unclear.
- Confirm the date, time, place, and event with counsel or the court before appearing.
Ohio County Initial Hearing Pattern
Ohio County local rules give a useful criminal pattern. Bonded-out or summoned defendants are generally set Monday and Thursday at 1:30 p.m. Incarcerated defendants are generally set those days at 2:00 p.m. Friday times are set by the court. These are patterns, not a promise for one case.
A case order controls. Motions, pleas, jury trials, family hearings, and continuances may use other times. Check the latest CCS, then confirm it.
- Initial hearing
- An early criminal event about notice, counsel, release, and next steps.
- Setting
- A date and time assigned for a court event.
- Continuance
- A court-approved move to a later date.
How to Read an Ohio County Setting
A setting is not always a trial. It may be an initial hearing, motion hearing, pretrial conference, plea, sentencing, or trial. Read all fields with the newest order because an old date can remain visible.
| Date | The scheduled date, subject to a later order. |
|---|---|
| Time | The event time, which may differ from a recurring docket time. |
| Courtroom | The place stated in the notice; do not infer an unpublished room. |
| Judge | The assigned officer, which can change after reassignment. |
| Setting Type | The event label, such as motion, plea, trial, or sentencing. |
Keep the full case number beside the setting. Names can be shared, and one party may have more than one open matter. Match the court code, case type, and event before relying on an Ohio County calendar line. This small check helps prevent a date from another case being mistaken for the reader's own hearing.
Ohio County Remote Court Dates
Indiana has a Court Streams resource for some open remote events. No Ohio County-specific stream or reusable meeting link was found. Join only through the case notice or clerk.
The Court of Appeals process shows that appeals follow the record and briefs, not the county trial calendar.

This keeps trial settings, appellate deadlines, and remote links from being mixed.
Ohio County Continuances and Resets
A continuance moves an event. It does not dismiss the case. An old date may stay in the CCS while a newer line records the replacement. Read events in sequence and inspect any linked order.
Ohio County motions, pleas, trials, provisional orders, and family hearings are set by case order. A missing web line is not proof of cancellation. Call the clerk or counsel when entries conflict.
The CCS entry date is the day the clerk entered the item and may differ from the hearing date. A short line may refer to an order whose full terms are in the Record of Judgments and Orders. If no public link appears, ask whether a copy can be inspected. Do not guess the next setting from an old line. Clerk staff can explain record access, but counsel must advise on a continuance request.
Ohio County and Federal Calendars
Federal matters do not appear in the Ohio County CCS. The county is assigned to the U.S. District Court for the Southern District of Indiana, New Albany Division. Federal records use separate systems.
The court's case-information page identifies PACER and CM/ECF.

The federal interface does not describe the Ohio County trial file.
The New Albany Division page supplies federal details.

This image marks the separate federal layer for local residents.
Ohio County Closure Checks
The county's official website publishes closures. Its 2026 list includes observed holidays and two election-related courthouse closures. If a closure meets a court date, wait for the court's new order and check MyCase.
Closure news and a case cancellation are not the same record. Keep the newest notice and case number ready when contacting the clerk.
The clerk is the fallback when web data is stale, a case is restricted, or the event is too near for doubt. Give staff the full 58C01 number. Ask a narrow question about the current public setting. For a paper that caused a change, request the order instead of asking staff to interpret it. If a transcript of an earlier hearing is needed, local rules assign transcript preparation to the court reporter.
If You Miss an Ohio County Setting
Act at once. Check the newest CCS for an order, warrant, bail change, or new event. Contact counsel and the Ohio County Clerk. Staff can confirm the public record but cannot give legal advice or promise a reset.
Missed a Setting? Ohio County's criminal bond rule says failure to appear can lead to bail revocation and an arrest warrant.
Contact the clerk and your attorney promptly to learn what the current calendar shows.
Seek advice from a licensed Indiana attorney before taking action.
A civil or family setting also needs prompt action. Read the order, keep proof of the notice received, and ask counsel what filing or appearance may now be required. Do not assume the case ended because the old date passed. The docket may show a default request, later hearing, or other response.
For any Ohio County matter, record the time of the call and the name of the office contacted. Ask for the next public event, not a prediction about what the judge will do. If staff direct you to a written order, obtain that order through the lawful public-access channel. A clear record of the check reduces the chance that an old screenshot or saved calendar line will be mistaken for the current setting.